TR
ANAGOLD ERZINCAN GOLD MINE PILOT PLANT & TREATABILITY R&D PROJECT
Home / Water and Waste Water / Anagold Erzincan Gold Mine Pilot Plant & Treatability R&D Project

Anagold Erzincan 
Gold Mine Pilot Plant & Treatability R&D Project

In the province of Erzincan, treatability R&D work was carried out at the Anagold Gold Mine Plant, and in this context, a pilot scale (500 liter/hour) wastewater treatment plant and portable laboratory were installed. After the installation of the plant was completed, it was operated for 90 days. During this operation, Ultrafiltration (UF) and Nanofiltration (NF) systems were tested at different pressures and recovery rates.

All water and wastewater analyzes and jar tests were carried out in the laboratory established together with the pilot plant. These tests were reported to the employer with the interpretation of our expert engineer staff. This reporting contributed to the interim and final reporting process, which included key conclusions and recommendations regarding the design, investment and operational requirements of the full scale plant.