Akfen Environment and Water signed a Build Operate Transfer (BOT) contract with the Dilovası Organized Industrial Zone Directorate (DOIZ) on August 3, 2007 for the Construction and Operation of the Wastewater Treatment Plant and Main Collector Line. In line with the 29-year BOT agreement, the Company’s wastewater treatment plant with a capacity of 21,144 m3/day (with 11,000 m3 currently being active), sludge drying plant, and wastewater collector lines have become operational as of July 1, 2010. With this project, Akfen Environment and Water has become the implementer of the first BOT model developed for the solution to the wastewater treatment problems of the organized industrial zones in Turkey.